Mondo Visione Worldwide Financial Markets Intelligence

FTSE Mondo Visione Exchanges Index:

Dalian Commodity Exchange: Notice On Conducting The Simulated Test Of The Egg Product Trading System

Date 01/11/2013

To simulate the smooth listing of the egg futures product, Dalian Commodity Exchange (DCE) has decided to conduct the networking test of the trading system from 10:00 am to 11:30 am on November 2 (Saturday). DCE requires the member units to arrange for the market representatives at the trading floor and the personnel related to the remote trading system and the settlement system to participate in the test in advance.
 
The test will retain the existing products and add new egg products, with the two-letter code of "jd" and a total of 10 contracts set, namely, jd1403, jd1404, jd1405, jd1406, jd1409, jd1410, jd1411, jd1412, jd1501 and jd1502. During the test, the trading personnel of the member units are required to complete the test operations for all the functions such as logging, opening a position, closing a position, the correctness of the trading data, the feedback speed for placing an order, the feedback speed for returning the report of successful trading, the real-time quotes, placing preparatory orders and capital changes. After the settlement at the closing, DCE will send the settlement data through the member service test system (http://10.93.249.12/Member/, logging by the production USB Key), and the settlement personnel of the member units are required to check whether the settlement data are correct.
 
Before the test of the system, the member units in the Futures Building using the DCE white disk software are required to download the new-version software supporting the egg product (DCE white disk) from the column of common materials of the member service system.
 
After the test, in order to facilitate the remote members timely returning the test results, DCE has opened the function menu of “system running security service - > feedback form of remote system test” in the member service system, and the member units are required to complete the “Test Feedback Form” before November 4.
 
The "Testing Contracts and Detailed Rules" (Annex 1), the “Test Contents and Schedule” (Annex 2) and the “Floor Test Feedback Form” (Annex 3) of the newly added egg products in the test may be downloaded from the “Notice on Conducting the Simulated Test of the Egg Product Trading System” in the column of “Exchange Notices” on the home page of DCE’s website (www.dce.com.cn).